• Round bar standard Download
  • Square-shape steel standard Download
  • Plate steel standard Download
  • Billet standard Download
  • Flat bar standard Download
  • wire standard Download
  • tube standard Download
  • pipe standard Download
  • Forging standard Download
  • casting standard Download
  • sheet standard Download
  • round bar standard Download
  • coil standard Download
  • Bar stock standard Download
  • profiled bar standard Download
Home > Standard > Steel Company: Geneva Steel standard

Steel Company: Geneva Steel

Steel Company: Geneva Steel standard Download, We provide the main countries around the ISO standard download, including: AISI(US),UNS(US),SAE(US),ASTM(US),AMS(US),ASME(US),MIL(US),FED(US),DIN(DEU),JIS(JPN),AFNOR(FR),B.S.(UK),SS(SWE),UNI(ITA).

Production specification

Round bar standard Download
Square-shape steel standard Download
Plate steel standard Download
Billet standard Download
Flat bar standard Download
wire standard Download
tube standard Download
pipe standard Download
Forging standard Download
casting standard Download
sheet standard Download
round bar standard Download
coil standard Download
Bar stock standard Download
profiled bar standard Download

Geneva Steel

Geneva Steel was a steel mill located in Vineyard, Utah, founded during World War II to enhance national steel output. It operated from December 1944 to November 2001. Its unique name came from a resort that once operated nearby on the shore of Utah Lake

Construction

The Geneva Steel mill was constructed with federal funds from November 1941 to December 1944 by Columbia Steel Company and US Steel corporation. Vineyard, Utah, was chosen as the location for the new plant because iron ore, coal, limestone, and other resources necessary for primary steel making are located nearby; and because Vineyard is far inland, away from possible Japanese attack on the West Coast.
Geneva Steel operated as a US government facility until June 1946, when it was sold for $47.5 million to US Steel, a vast underbid compared to the mill's estimated $144 million value.

Operation

The plant was an integrated steel mill. Raw materials were shipped here by rail, processed into steel and steel products, and then reshipped by rail to their final market. The plant, in addition to having all of the facilities for primary steel making, included on-site conversion of coal into coke, plus other facilities for post processing of coal byproducts, including production of inorganic fertilizers. Blast furnaces converted raw iron ores into pig iron, and final conversion into steel was via open hearth furnaces. Rolling mill facilities for forming steel into plate, pipe, and some structural shapes were also located here.
Economic importance and continuing viability

During its operation Geneva Steel was important to the Utah County economy, providing thousands of jobs and attracting many ancillary businesses to the area. As time went on, however, the distance from the plant to any major steel market, increasing labor costs, foreign imports, and the general decline of manufacturing industries in the USA contributed to the decay of the business.

Early in 1987 the mill shut down temporarily but reopened later after the mill was spun off from US Steel and purchased by local business interests. In the late 1980s and early 1990s, Students from Brigham Young University protested the pollution, particularly the particulate matters, emitted from the steel operation. They carried signs at the entrance of BYU football games that included slogans like, "Pollution makes God barf." These protestors were threatened by steel workers and were marginalized as the Utah Valley community sided with Geneva Steel.
The Cannon Brothers bought the plant with the help of Utah Senator Orrin Hatch. They kept it open for the longest time possible. In March 1999 the company filed bankruptcy and reorganized with a $110 million loan via the Emergency Steel Loan Guarantee Act, but the reorganization attempt failed. Geneva Steel filed bankruptcy again and shut down permanently in November 2002.

There is some controversy regarding their alleged pollution of Utah Lake. Contaminated groundwater under a former Utah steel mill may be moving toward Utah Lake according to a recent report conducted by a Salt Lake City engineering company. The Utah Department of Environmental Quality is investigating the CH2M Hill study of the Geneva Steel site in Vineyard to determine if contaminated groundwater is moving beyond the facility boundary. The facility site and environmental contaminants are being remediated under EPA's voluntary Brownfields cleanup program.

U.S. Steel operated the site in the early 1940s, producing millions of tons of steel for the war effort. After the war, U.S. Steel ran the company until 1987 when it sold the plant to Geneva Steel Company. During its years of operation, the facility produced wastes contaminated with human carcinogens and hazardous substances including arsenic, lead, zinc, nickel, acids, PCBs and petroleum products. Arsenic, ammonia and benzene recently showed up in a number of groundwater monitoring wells around the perimeter of the plant. The Utah Department of Environmental Quality is still unsure, however, if toxic chemicals are definitely moving toward Utah Lake.

Liquidation deals

Liquidation of Geneva Steel's substantial assets is still ongoing and may have broad effects on Utah County's future development.

Geneva Steel's 1,750 acres (7 km2) of land were sold in November 2005 for $46.8 million to Anderson Geneva, a sister company to Anderson Development, which plans to reuse the land for a wide range of purposes, including as a possible commuter rail corridor. The land must undergo environmental cleanups before any development can occur, with most of the cost paid for by US Steel. The mill equipment will not remain because it has been sold for $40 million to the Chinese firm Qingdao Iron & Steel Group.

Most of Geneva Steel's water rights were sold to the Central Utah Water Conservancy District in May 2005 for $88.5 million, with some additional water rights sold for $14 million to the private firm Summit Vineyard, LLC, which has used them to support a power plant. Its iron ore properties were sold for $10 million to Palladon Ventures Ltd, which hopes to build a new steel mill with modern technology closer to the iron ore mines.

Geneva Steel's 7,000 tons of emission reduction credits are also for sale. In January 2006, local citizens announced they were forming a group to attempt to purchase and retire those credits in order to maintain local air quality. The exact price of the credits will be determined by the open market, but estimates of the value of the emissions reduction credits range from $350,000 to $35,000,000.

The site today

Early in 2007, the site made headlines in the Utah press, as owner Anderson Geneva made an offer to Real Salt Lake. The deal included moving their stadium to the Geneva site and they, AG, would offer up the land for free. The offer was subsequently turned down.
Timpanogos Harley-Davidson is located on part of the site of the old steel mill.

Related hot word search:Geneva Steel Steel Company: Geneva Steel round bar,Steel Company: Geneva Steel forging,Steel Company: Geneva Steel sheet,Steel Company: Geneva Steel coil,Steel Company: Geneva Steel flat bar,Steel Company: Geneva Steel pipe,Steel Company: Geneva Steel Lrregular

Prev:Steel Company: Pakistan Steel Mills
Next:Steel Company: Maraging steel